How do you manage engineers?
Give them a clear problem and leave the method to them, protect their project days from line calls, and explain your decisions. Each of the seven practices above comes with a check.
How do you measure an engineer's performance in a plant?
By the plant numbers their work moves: scrap, downtime, changeover time and project dates hit. Agree on the one or two numbers each project should move before it starts. Counting tickets closed or hours logged rewards looking busy over fixing things.
How do you motivate engineers?
Mostly through intrinsic motivators: hard problems, control over the method and visible progress. The mix differs by person. Some want novelty, some want a stable, well-specified process, some want a number that moves. Ask, or measure it with an
intrinsic motivation assessment, and match the work to the person.
How do you manage engineers who know more than you?
Skip faking technical depth, whether or not you are an engineer yourself. Your job is priorities and blockers. Ask them to walk you through the trade-offs in plain terms, ask what they would need to be confident, then make the call and say why.
How do you manage engineers in a manufacturing plant?
Separate firefighting from project work. Put one engineer on line support each week and route every call through them, so the others get whole days on improvement projects. Tie projects to plant numbers such as scrap, downtime and changeover time, and recognize fixes in front of the operators who use them.
Should your best engineer become a manager?
Only if they want to. Managing people is a different job, and moving a strong engineer into it can cost you the engineer and give you a reluctant boss. Ask each person which way they want to grow, and give the technical route real steps: process ownership, launch leadership and paid certifications.
What should a new manager of engineers do first?
Hold a one-on-one with each engineer in the first two weeks. Ask what they are working on, what gets in their way, and how they like to be managed. Then fix the blocker you hear about most before changing anything else.
How does Attuned help managers of engineers?
Each engineer takes a 10-minute assessment that ranks 11 intrinsic motivators. A two-minute pulse every two weeks shows which team is slipping, at team level once three people answer. TalkCoach (early access) helps prep the next one-on-one.
Team plans start at US$99 per person per year.