These Theory X and Theory Y examples hand the same workplace situation to two managers: one who assumes people need pushing and close control, and one who assumes they will run their own work toward goals they believe in. Eight situations, from a quality hold at 2:40 a.m. to a parking ticket waiting for a signature.
A Quality Hold on Second Shift
At 2:40 a.m. an operator notices burrs on a batch of machined housings. The supervisor is in a meeting on the other side of the site.
Assumes operators would stop the line to dodge work, so only a supervisor may call a hold.
The operator radios in and waits for a callback. The line keeps running until the supervisor walks over and confirms the defect.
Assumes the person closest to the part can judge it, given clear criteria.
Written hold criteria sit at the station. The operator tags the batch, stops the cell and calls the supervisor, who reviews the decision when the meeting ends.
Both managers keep the same quality standard. They differ on who may act on it.
Same situation, two managers. An illustrative example written for this page.
Attuned motivator data runs inside 300+ companies, including





Douglas McGregor set out Theory X and Theory Y in his essay The Human Side of Enterprise and in a 1960 book of the same name. They are two sets of assumptions a manager can hold about people at work. Under Theory X, people avoid work and responsibility, so management has to direct and control them. Under Theory Y, people can direct their own effort toward goals they are committed to, and will take on responsibility when conditions support it.
The full comparison, with the assumptions side by side and a worked delegation agreement, is in our guide to McGregor's Theory X and Theory Y. This page stays with examples.
Example 01 is the quality hold at the top of the page. The other seven follow the same layout.
A team of six ships firmware for a packaging machine every two weeks. The engineering manager approves every merge personally.
Assumes engineers will cut corners unless someone senior checks every change.
Keeps personal approval on every merge request, one-line fixes included. Reviews pile up on the Thursday night before each release.
Assumes engineers care about code that works and can hold each other to a standard they helped write.
Agrees a review rule with the team: two peer approvals for any change, and the manager joins reviews that touch safety interlocks or the architecture.
If your own procedures require an independent review of safety-related machine software, keep it whichever way you lean.
A maintenance technician wants to change how often a conveyor gearbox is serviced. She has six months of wear notes from opening it up.
Assumes technicians will skip steps if they are given any latitude.
Enforces lockout and tagout on every job, which is right. Also refuses to discuss the interval: "Follow the schedule."
Assumes the person who opens the gearbox knows things the schedule does not.
Enforces the same lockout steps, with no exceptions. Agrees to trial her interval on one conveyor for a quarter and compare the wear records.
Both managers run the same lockout procedure. They part ways over the technician's notes.
After a software update, a support team's queue triples. The manager's dashboard shows average handling time climbing.
Assumes agents slow down when nobody is watching the clock.
Sets a handling-time target for each agent, posts a daily ranking and requires the script on every call.
Assumes agents want to fix the customer's problem and can see patterns the dashboard misses.
Asks the team what is driving the long calls. Two agents write a fix guide for the top issue, and handling time is tracked for the team, next to first-contact resolution.
A production planning team splits its week between the office and home. A director asks why one planner is often offline at 3 p.m.
Assumes people at home work less unless they are visibly online.
Requires a green status from nine to five, cameras on for stand-ups and a weekly log of hours.
Assumes people will manage their own time when outcomes and handoffs are clear.
Agrees two overlap hours for handoffs, a response time for urgent messages and the deadline for the weekly plan. Outside those, the planner sets her own hours.
A role that covers a shift, a phone line or a production schedule needs fixed hours. That is a staffing fact, whatever the manager assumes.
A process technician joins from another industry with a strong record. Week one is on an unfamiliar line.
Assumes new people need watching, and so do experienced ones.
Supervises closely in week one, which is reasonable. Six months later, every machine adjustment still needs a sign-off.
Assumes the new hire can take on responsibility as their skill on this line grows.
Supervises just as closely in week one, then hands over decisions in stages: adjustments within spec after week three, process changes after a review in month three.
Close supervision of a new starter fits Theory Y. What separates the two managers is whether the supervision has an end date. Our piece on giving people autonomy without losing control walks through four stages, from close supervision to full delegation, drawn from The One Minute Manager.
Line 3 finishes the week 12% under its output target. The plant manager wants it fixed by Monday.
Assumes the shortfall means people were not working hard enough.
Schedules mandatory Saturday overtime and adds an hourly output check.
Assumes the people on the line know what slowed it down.
Holds a 20-minute huddle on Friday. The crew names two long changeovers and a late material delivery. Saturday overtime still happens, and Monday starts with a changeover trial the operators designed.
The Saturday shift may be unavoidable either way. What differs is the plan for Monday.
Field service engineers visit customer sites most weeks. Every expense, down to a parking ticket, needs the manager's signature.
Assumes that without a signature on every receipt, people will pad their claims.
Keeps line-by-line approval. Claims wait two weeks whenever the manager is travelling too.
Assumes most people claim honestly when the rules are clear and checked.
Sets a written limit below which engineers claim without pre-approval, with receipts uploaded and a random monthly sample audited by finance. Above the limit, approval stays.
Audits and spending limits suit either assumption. Theory Y moves the check to where it costs the least.
Every Theory X column above has the same shape. A control goes in, people stop offering what the control makes pointless, and the manager sees exactly the behavior the assumption predicted. McGregor saw it the same way. In his essay The Human Side of Enterprise he wrote that the conventional approach of Theory X "is based on mistaken notions of what is cause and what is effect." Passivity and refusal to take responsibility, he argued, are a consequence of how organizations are run: their management philosophy, policy and practice.
Quality engineers have a test for this kind of trap, the gauge R&R study, which asks how much of the variation in a set of readings comes from the measuring system and how much from the parts. A manager who has signed off every adjustment for a year and then rates the team on initiative is mostly reading the gauge.
Loosen one control on purpose, with clear limits and a review date, and the next reading comes from the people.
Source: McGregor, D. M., "The Human Side of Enterprise," reprinted in Leadership and Motivation (The M.I.T. Press, 1966). Read the essay via MIT.
The examples above are illustrations. McGregor's own essay names real companies and practices he saw as consistent with Theory Y. He presented them as promising applications, written decades ago, with no audited results attached.
McGregor pointed to its flat organization. With so many people reporting to each manager, nobody could direct and control them in the conventional way, so the structure forced management by objectives.
He credited both with pioneering job enlargement, which encourages people at the bottom of the organization to accept responsibility. He called reorganizing work at the factory level one of the more challenging opportunities for Theory Y.
He named it the outstanding example of participation and consultative management in practice, giving people some voice in the decisions that affect them.
He described these firms experimenting with people setting their own targets and appraising their own performance. Conventional appraisal, he argued, treats a person like a product under inspection on the assembly line, with the boss as inspector.
He also warned that ideas like these often disappoint when a management adopts them and keeps running them on Theory X assumptions. Source: McGregor's essay, as above.
The examples share one awkward fact. Two people in the same job can want very different amounts of structure. One technician wants the problem and a deadline. Another wants a clear procedure and to know exactly what she owns. Neither preference tells you how hard either of them works.
Attuned's intrinsic motivation assessment measures 11 intrinsic motivators in about 10 minutes. Two bear directly on these examples: Autonomy (independence, freedom and personal responsibility) and Security (structure, predictability and clear responsibilities). Theory X and Theory Y describe managers, so the assessment leaves them out.
Its AI coach for managers, TalkCoach, is in early access. It uses the motivator profiles people have shared to help a manager prepare a conversation, such as handing a decision to someone high on Autonomy, or explaining a new hold procedure to someone high on Security.
Same task: own the changeover checklist
Illustrative example. Names and scores are invented.
“New hires have never had a company care about their individuality in this way before.”
Josh MoogDirector of HR, Barnett Plumbing & Water Heaters, a hands-on trades workforce · Read the storyBook a 30-minute demo. We'll show you how a manager reads each person's intrinsic motivators, Autonomy and Security included, and prepares the conversation with TalkCoach.
Book A Demo